聯(lián)系我們
青州統(tǒng)一重工機(jī)械有限公司
手機(jī):15953665789 18706518777
電話:0536-3533567
地址:青州市彌河鎮(zhèn)小張計村
全國客服熱線:15953665789
您當(dāng)前的位置:首頁 > 文章中心
炎炎夏日,抽沙船預(yù)防高溫天氣風(fēng)采依舊
夏天已經(jīng)到來一段時間,伏天即將來臨,都知道,伏天是整個夏天最熱的日子,那么抽砂船的高溫預(yù)防工作準(zhǔn)備了嗎?還是已經(jīng)完成了。完成的話今天小編帶您了解下抽沙船在啟動前應(yīng)注意的事項:
抽沙船有5項需要注意一下哦。
啟動前需要檢查下各部位的螺絲有沒有擰緊,是否牢固;電器設(shè)備是否可以可以正常使用。
檢查電源供電是否正常,檢查抽沙船的指示器是否與實際相符。
為了保護(hù)蓄電池和電機(jī),應(yīng)每次啟動時間不超過十秒鐘。如果啟動時間過長或次數(shù)過多,需要檢查原因排出故障。
想要查看油泵運(yùn)動件是否存在卡阻現(xiàn)象,需要用手轉(zhuǎn)動油泵,需要檢查的幾項是,各系統(tǒng)的閥門,液壓油,工作油,密封處的密封情況。
啟動后,抽沙船浮體的寬度和長度的尺寸是根據(jù)挖沙的深度來規(guī)定的,兩個浮體之間要留有空間,是為了防止浮體之間不亂的原則。
Summer, hot weather is still pumping sand prevention style.
Summer has come to a period of time, the summer is coming, all know, summer is the hottest summer days, then chousha boat high temperature prevention work ready? It's still finished. Pumping sand matters should be paid attention to in before the start of the finish today Xiaobian take you to understand:
Pumping sand 5 need attention oh.
Before starting, it is necessary to check whether the screws in each part are tightened or not; whether the electrical equipment can be used properly.
Check if the power supply is normal, check whether the indicator is consistent with the actual pumping sand.
In order to protect the battery and motor, it should start at least ten seconds each time. If the boot time is too long or too many times, the cause must be checked out.
Want to see whether the oil pump moving parts of the card phenomenon, the need to turn the oil pump by hand, the need to check a few items are the system valves, hydraulic oil, oil, sealing the sealing situation.
After the start, pumping sand float width and length size is based on the depth of dredging requirements, to leave a space between the two floating bodies, in order to prevent the chaos principle between floating body.
We have used in pumping sand, most do not want to see is the plugging phenomenon. Plugging will be time-consuming, artificial, need to clear the pipe before they can be used properly. We need to look at the concentration of sediment inside the tube sand, sand pumping pipeline distance we can not see with the naked eye, you need to install a pressure gauge in the pipeline, pumping sand concentration control through observation of pressure gauge.